Forecast timeline: 15 minutes, hour, day, 10 days.
Horizons
15 minutes, hour, day, 10 days. Generation history from the meter at the connection point.
The operator expects a plan.NEXIVO files it.
RES production forecasts and generating-module work plans filed with the operator. From 0.2 MW.
One farm. One object.Forecast from two weather algorithms.
Today + 9 days ahead.The operator’s horizon. Day, hour, 15 minutes.
Forecast vs meter.Compared at the connection point.
Daily, automatically.To every DSO and the TSO.
Plan filed. Record kept.
NEXIVO SOGL
From 0.2 MW you are a Significant Grid User (SGU) and, under SOGL, you file a generating-module work plan for today and the next 9 days: generation forecast, availability, outages. NEXIVO computes that plan every day and files it on your behalf. The threshold is 200 kW - not 20.
Photovoltaics.The farm as an object.
Connection point (PPE) and generating module. The model that times the sunrise computes the work plan.
Wind.The farm as an object.
The same model. Different weather data.
CHP.One object.
The same model. It forecasts power, not weather.
Hydro.One object.
The same model. The threshold is capacity, not technology.
What you get

Forecast timeline: 15 minutes, hour, day, 10 days.
15 minutes, hour, day, 10 days. Generation history from the meter at the connection point.

Weather mesh over a farm.
Trained on weather and your farm’s meter history. On historical PV readings accuracy is about 94%.

Farm and a line to the operator.
The operator receives the full set of daily planning data. The model computes, the system files, a record stays.

Map of Poland - grid operators.
Filing with every DSO and the TSO in Poland. Energa and PGE are already live, the rest as well.
Weather.Two algorithms.
If one stops responding, the other keeps the forecast.
Radar.Weather and meter.
The model learns your farm from weather and meter history.
Night.Daily. Automatically.
The forecast runs overnight. By morning it is with the operator.
NEXIVO SOGL
PV, wind, hydro, CHP. You add each farm as an object. The model computes the forecast, the system files the work plan with the operator.
The model learns from the meter and weather at your farm. On real PV readings accuracy came out at about 94%.
Production, consumption and net balance on one timeline. Consumption comes from the meter profile.
What went to the operator, when, and with which values. When a client or the DSO asks - you show it.
Objects
Objects in NEXIVO. The list grows with every new installation.
Product
Connection-point dashboard, 10-day forecast and demand from the operator profile.

Connection-point dashboard: production, demand, balance.

Production forecast for 10 days, day and 15 minutes.

Operator meter profile attached to the farm.
Details
This is SOGL forecasting in the power system: full generation forecasts and data exchange for planning and operating the Polish power system (KSE). Basis: Regulation (EU) 2017/1485. SOGL (System Operation Guidelines).
If you run a type B, C or D unit - a generating module from 0.2 MW - you are an SGU (Significant Grid User). The operator expects a day-ahead generation forecast, own demand and planned outages.
In NEXIVO you add the farm as an object - PPE and generating module. The model computes the forecast and the system files the work plan with the operator: for your own module or for the points you run from one account.
SOGL is the EU rulebook for power-system operation. It ties TSOs, DSOs and SGUs together so system operators see distributed generation, not only large plants.
For a producer that means a day-ahead generation forecast sent to the operator, not an internal plan - SOGL reporting to the right DSO or TSO, in the format and timing the network needs.
SGUs include operators of type B, C and D generating units - in practice every generating module with installed capacity of 0.2 MW or more.
The 0.2 MW threshold - 200 kW - covers PV farms, wind plants, hydropower plants and other sources at that scale. If you sit above it, the operator expects a generating-module work plan: a day-ahead generation forecast including own demand and planned outages. Type A-D table and the 20 kW myth - on the duty page.
The operator expects a work plan: scheduled net active-power generation (PGEN), maximum and minimum availability (PDmax / PDmin), and with autogeneration also power injected into the grid (PGENa). The network horizon is the current day through d+9. NEXIVO computes 10 days - the operator gets the daily plan SOGL requires.
The TSO and DSO notice of 25 March 2025 calls on owners of type B, C and D modules to file plans. From 14 April 2025 operators monitor quality: whether the required data was submitted before each hour of the day. That is not a nudge. That is a check. Full work-plan, PGEN and monitoring write-up.
The DSO or TSO gets the daily plan: how much the source will produce, how much goes to own demand, and when the unit will not run (maintenance, fault, curtailment). Without that, KSE operations lack a complete picture of distributed generation.
In NEXIVO you add the farm as an object: PPE and generating module, operator (every DSO and the TSO in Poland), and the meter profile. The system holds the actual farm, not a file.
The forecast rests on weather and generation history at the PPE. We run two independent weather algorithms - if one stops responding, the other keeps the forecast. Distributed portfolio: PV, wind, hydro, CHP - one farm or several from a single account.
In the module you work with 10-day, day-ahead and 15-minute views. The operator gets the daily SOGL plan; in the platform you see it next to demand and balance.
SOGL is not tied to one technology. A type B, C or D source from 0.2 MW reports whether it is PV, wind, hydropower or CHP. In NEXIVO each farm is an object: PPE, generating module and outages. The model computes the forecast, the system files the plan with the operator.
You only see model quality when you compare the forecast with actual production at the PPE. Before the plan goes to the operator, NEXIVO shows RES production, demand and balance (surplus or deficit) on one timeline.
Plus a record: what went to the DSO or TSO, and when. That is reporting - every day, logged in NEXIVO.
Create an account, open NEXIVO, go to SOGL. Add the farm as an object - PPE and generating module - and upload the meter profile. From then on the model computes the forecast and the system files the plan with the operator. The eight steps - from the 0.2 MW threshold to filing - are below.
On the network side the farm should be assigned to Nivato’s account at your DSO with forecasting rights. We prepare the request together - you are not left alone with a letter to the operator.
Start
You do not need to know the regulation. Configure the farm once; then the model computes and the system files - for your own module or for the points you run.
Your own farm: one point, one work plan a day. The first month is free for setup - we go through it together. Then the plan goes to the operator automatically.
Several farms from one account. Forecast, the DSO request and daily filing are handled by us. You hold a record of every filing for every client.
Installed generating-module capacity ≥ 0.2 MW (type B, C or D)? That is an SGU. The operator expects a generation plan, own demand and outages - from the owner or from the party filing on their behalf.
Open NEXIVO and switch on the SOGL module. The first month is for setup: the farm, DSO assignment, the first filings. We go through it together.
Create an accountThe operator must add the installation to Nivato’s account with forecasting rights. Without that it will not accept data from NEXIVO. We prepare the request with you.
PPE and generating module - the actual farm, not a file. You pick the operator from every DSO and the TSO.
The operator’s meter profile is attached to the farm. The model learns its production and shows the first forecast.
You enter planned outages. Two independent weather algorithms keep the forecast.
A 10-day horizon: production, demand, balance. Every active farm recomputes daily on weather and meter history.
Forecast vs meter at the PPE. The work plan goes to the DSO or TSO automatically. NEXIVO keeps the record: what, when, with whom.
Open NEXIVOSOGL (System Operation Guideline) is Commission Regulation (EU) 2017/1485 of 2 August 2017 on electricity transmission system operation. It governs TSO, DSO and SGU cooperation for planning and operating the Polish power system (KSE).
Significant Grid Users with type B, C and D generating units — in practice generating modules from 0.2 MW. The operator receives a day-ahead generation forecast, own demand and planned outages.
SOGL is a duty toward the network operator: the generating-module work plan - daily forecast, own demand, outages. Commercial balancing is hourly schedules for a trading party — different recipient, different resolution. NEXIVO computes and files the SOGL work plan. We do not do commercial balancing.
10 days, one day and 15 minutes — RES production, demand and balance. The operator gets the daily work plan required by SOGL.
Yes. The 0.2 MW threshold is technology-agnostic. One PPE in NEXIVO can hold photovoltaics, wind, hydropower and CHP.
In NEXIVO: sign in, open the SOGL module, add the farm as an object (PPE and generating module), upload the meter profile. From then on the model computes the forecast and the system files the work plan with the operator. The installation must be assigned to Nivato at the DSO with forecasting rights.
A model trained on weather and PPE meter history, for PV, wind, hydro and CHP. Two independent weather algorithms — if one stops responding, the other keeps the forecast. On historical PV readings accuracy is about 94%. Every day the model recomputes the farm and the system files the work plan with the DSO or TSO.
By checking the 0.2 MW threshold and creating a NEXIVO account. The first month is free to set up the farm, DSO assignment and the first filings. Then the model computes and the system files. The eight steps are above.
Yes. You run your own farm or a portfolio of points from one account. Setup, the DSO request and daily filing are handled together — first month free.
No. The threshold is 200 kW (0.2 MW) — type B, C and D modules. 20 kW is type A, usually a micro-installation. Generation control above 10 kW should not be confused with the work-plan duty. The capacity table is on the duty page.
Planning data for the DSO or TSO: PGEN, PDmax/PDmin, own demand, outages. The network horizon is d+9. NEXIVO computes 10 days; the operator gets the daily SOGL work plan. Work-plan details.
Scheduled net active-power generation — average power in that hour at the connection point, after own demand. With autogeneration the operator also expects PGENa (power injected into the DSO grid).
TSO and DSO notice of 25 March 2025. Monitoring — whether data was submitted before each hour of the day — from 14 April 2025.