Qualification

The SOGL duty starts at 200 kW.
Not at 20.

200 kW threshold on a RES farm
200 kW threshold

RES farm to the horizon.

SGUs (Significant Grid Users) include users with type B, C and D generating units. In practice: every generating module with installed capacity ≥ 0.2 MW (200 kW). PV, wind, hydro, CHP - same threshold. SOGL reporting in NEXIVO.

RfG / SOGL types in Poland

TypeCapacity / connectionSOGL work plan
Afrom 0.8 kW to below 200 kW, voltage < 110 kVNo. 20 kW sits here.
Bfrom 200 kW to below 10 MW, voltage < 110 kVYes - to the relevant DSO
Cfrom 10 MW to below 75 MW, voltage < 110 kVYes - to the relevant DSO
D≥ 75 MW or connection ≥ 110 kVYes - DSO and also TSO (PWDP)

The 20 kW myth

Two duties get confused in the industry. A micro-installation above 10 kW must have a port for DSO commands: curtail or stop generation. That is not a generating-module work plan. SOGL reporting - PGEN, availability, daily forecast - starts at 200 kW.

Your own farm and a client portfolio

Your own farm from 200 kW: you are the SGU - you file yourself or grant rights. A portfolio of points: an O&M company or asset manager files from one NEXIVO account. The duty rests with the SGU; who files follows from DSO rights. In NEXIVO filing is automatic.

Check the threshold.
Open NEXIVO.